Design and build · Southern Tasmania
Most builders design first and cost later. We cost your home live, while it is being designed, so the drawings and the budget never drift apart. Fixed price at approvals, before you commit to construction.
Obligation free. A clear conversation about your project and your site.
Obligation free. We come back within one business day.
One of the Axis team will be in touch within one business day to arrange your call.
Pick a time now
It starts well. You engage an architect, you talk through how you want to live, and a few months later the drawings arrive. They are better than you hoped. You show them to family. You start imagining the first winter in that living room.
Then the drawings go out to builders to be priced.
The number comes back and it is nowhere near what you had in mind. Not ten percent over. Often thirty or forty.
Now every option is a bad one. You pay to redesign a home you have already fallen in love with, stripping out the double glazing, the ceiling height, the deck, the things that made it worth building in the first place. Or you absorb the number and carry a mortgage you did not plan for. Or you walk away from the drawings entirely, months and many thousands of dollars later, and start again.
None of that happens because anyone was careless. It happens because of how the industry is structured.
"We want something better than a cookie-cutter house, but we don't know where to start."
"We don't want to juggle five different consultants."
"We're nervous about going over budget."
"We don't want to make the wrong decision."
"We want a home that reflects how we actually live."
They only speak to each other at the end. Which is why the price is always a surprise.

An architect designs. A builder prices. They are separate businesses with separate fee structures, and in most projects they do not meet until the drawings are finished.
So the architect designs toward your brief using rates of thumb, and the builder prices what is actually on the page, with real subcontractor quotes, real material costs and real site conditions. The gap between those two numbers is not anyone's fault. It is structural.
By the time the real price exists, every decision that created it has already been made. That is the trap.
There is a second cost nobody warns you about. When something goes wrong on site, a separate architect and builder each have a reasonable account of why it is the other one's problem. You are the only person in the room without a professional opinion, and you are the one paying to resolve it.
Both problems have the same root, and the same fix.
Architecture and construction sit under one roof at Axis. That single structural difference is what removes the guesswork from your budget.
Every design decision carries a number while you are making it. You see what the extra glazing costs before it is in the drawings, not after. Cost becomes an input to the design rather than a verdict delivered at the end.
By the time permits go in you hold a fixed price construction quote. Not an estimate, not a range, not a number with an asterisk. A figure you can take to a bank and plan a year around.
No handover gap between designer and builder. The people who drew your home are still accountable for it when it is being built. One contact, one fee, nobody to point at.
Start with a call. No obligation, and nothing to prepare.
Book a call



Five stages, each with a defined outcome and a price you can see up front. The first two cost you nothing. You can stop after any of them.

A call to discuss your project and explore whether it is feasible. We will tell you if it is not.
We meet you on site. Slope, access, orientation, bushfire rating, services. We talk through the opportunities and the challenges, and answer your questions.
We develop floor plan configurations, create 3D visualisations and provide a preliminary construction quote. This is where costs start updating live against your decisions.
We engage consultants, submit permits, present your fixed price construction quote and finalise interior selections. You know the final number here, before construction.
Our in house team delivers the build, carries out 15 or more quality assurance inspections and professionally cleans your home before handover.
Allow around nine months for approvals and a further nine for construction, depending on site conditions and design complexity.
Most builders will not put a figure on a page. These are ours. Your site will move them, which is exactly why we assess it before quoting rather than after.

Roughly where a three bedroom home on a straightforward site starts, covering approvals and construction in Tasmania.
Most Axis homes fall in this band. We have delivered beyond it where the site and the brief warrant it.
Slope, access, bushfire rating and services change what a block can carry more than the house itself does.

You might be thinking
It is a fair worry, and it is why we show the work rather than argue the point. Our homes have been finalists in the HIA Tasmanian Housing Awards. Judge the buildings, not the business structure.
You might be thinking
The fixed price quote at approvals. You see it before construction starts and before you are committed. If it does not work for you, you have spent the concept and approvals fees and nothing more.
You might be thinking
No. We typically manage both design and construction to keep them aligned, but we can review existing plans and advise on the best way forward.
You might be thinking
Yes, and it often does. We regularly work with clients relocating to Tasmania and structure communication around it.
You might be thinking
Changes are possible. We aim to resolve the decisions that matter early so there are fewer of them, and any change is put to you in cost and time before it happens.
We would rather tell you now than six weeks into a process that was never going to suit you.


Who you are working with
Axis is a design and build studio based in Cambridge, working across Southern Tasmania in both urban and regional areas. We regularly work with clients relocating from the mainland.
Because the designers and the builders are the same business, the person who drew your home is still accountable for it when it is being built. That is the whole idea.
Start your journey
We would like to understand your vision, your site and what you are hoping to create. There is no obligation and nothing to prepare.
Prefer to talk now? Call 0476 662 062 or email info@axishomes.com
We will come back to you within one business day.
One of the Axis team will be in touch within one business day to arrange your call.
Pick a time now
Costs depend on the site as much as the house. As a guide, a three bedroom home on a straightforward site starts from around $450,000, covering approvals and construction in Tasmania. Slope, access, bushfire and services affect the cost, which is why we assess your site before quoting rather than after. At concept stage we align budget and design, so you have real numbers before you commit to approvals.
Most of our homes fall between $700,000 and $1,200,000. We have delivered projects in excess of this and are set up to go beyond that where the site and brief warrant it. The process does not change at either end of the scale. The difference is scope, not the level of attention.
The timeframe varies with site conditions, design complexity and approvals. As a guide, allow around nine months for approvals and a further nine months for construction.
We typically manage both design and construction to ensure alignment. However, we can review existing plans and advise on the best way to proceed.
We typically work across Southern Tasmania, delivering projects in both urban and regional areas. If you have a project on Tasmania's East Coast or in the north of the state, let us know, as we may be able to accommodate additional locations.
We align design decisions with your budget from the beginning and maintain transparency throughout the project to avoid unexpected costs. You hold a fixed price construction quote at approvals, before construction begins.
Changes are possible, but we aim to resolve key decisions early to minimise disruption. Any changes are clearly communicated in terms of cost and timeline.
We specialise in new homes rather than trying to be a jack of all trades, so we do not undertake renovations. If you have a substantial extension or rebuild project we are happy to chat, and if we cannot help we will point you in the right direction.
Yes. We regularly work with interstate clients and structure communication to ensure a smooth and well managed process remotely.